CHINA → UNITED STATES LCL · FCL · US WAREHOUSE DELIVERY A Haishun Tiancheng service
FDAshipOCEAN FREIGHT & US IMPORT PREPARATION Get a quoteQuote

US customs clearance for food imports follows a repeatable sequence. This guide walks through the steps, the people involved and the documents to prepare.

The clearance steps

US customs clearance for food imports follows a repeatable sequence, and the order matters. Before the vessel even loads, the ISF (10+2) must be filed — no later than 24 hours before the cargo is laden on board. As the ship nears the US port, FDA prior notice goes in, at least 8 hours before arrival for ocean cargo. Around arrival, the licensed broker files the customs entry with the FDA-related data attached.

After entry comes the waiting game. CBP may release the cargo immediately, or it may select it for examination; FDA can also elect to inspect or sample. Once released, the container moves to drayage and delivery to your receiver. The timeline below ties each step to a point in the sailing.

Not every shipment is examined. CBP and FDA risk-screen each entry based on the importer, the product, the country of origin and the commodity code. A clean history and a complete document pack tilt the odds toward a straight release; missing paperwork or an unfamiliar product pulls the shipment into the inspection lane, where a container can sit for extra days while officers review or sample it.

StepTimingWho filesDocuments needed
ISF (10+2)No later than 24 hours before cargo is laden on boardImporter via brokerShipper/supplier and container details
FDA prior noticeAt least 8 hours before ocean arrivalImporter or brokerProduct details, quantity, carrier info
Customs entry (ACE / CBP 7501)At or after vessel arrivalLicensed customs brokerInvoice, packing list, bill of lading, HTS
Duties and MPFOn entry / after releaseImporterMPF is an ad valorem fee on formal entries
Examination and releaseIf selected by CBP or FDABroker coordinatesInspection or sampling records
Entry summaryNormally within 10 days after releaseBrokerFinal entry reconciliation
An overhead view of a cardboard box filled with various food items, including bags of rice, oats, lentils, a bottle of oil, and canned goods.

Who does what

Three parties share the process. The importer of record owns the compliance decisions and the filings; the forwarder coordinates the freight side and keeps the document pack moving; the licensed customs broker files the entry and answers CBP’s questions. Knowing who does what prevents the “I thought you were handling that” moment that holds shipments up.

A forwarder worth their fee runs the process as one handover, not three separate people each waiting for someone else’s email. They know which document goes to which party, and when, so the filing windows close on time.

Timeline and documents

Keep the timing tied to the sailing. ISF days before loading; prior notice in the final hours before arrival; entry at the port; the entry summary normally within 10 days after release. The document pack to keep on every shipment includes the commercial invoice, packing list, bill of lading, product records and the filing confirmations. On formal entries CBP also applies a merchandise processing fee (MPF), an ad valorem fee on the entry value, so budget for it rather than treating it as a surprise.

Keep the filings ahead of the clock rather than on it. ISF filed late — after the vessel has already loaded — draws a penalty and can delay the whole sailing, and prior notice that misses the 8-hour window can push the cargo into secondary inspection. Building a buffer of a day or two into the booking protects the schedule far more than trying to chase the last hour.

How the forwarder helps

The forwarder’s practical job is coordination: assembling the document pack before dispatch, handing it to the broker early enough to file on time, and building the clearance window into the delivery plan. Clearance time is not optional — it is a line item between the ship docking and the truck leaving the terminal, and it changes the door-to-door calendar for the whole shipment.

Frequently asked questions

How long does clearance take?

It varies by commodity, port and whether CBP or FDA selects the shipment for examination. Unexamined entries can clear quickly; examinations add days. The forwarder builds a realistic clearance window into the total delivery plan rather than promising a fixed number that the port never honors.

What happens if documents are incomplete?

Incomplete documents are the most common cause of delays and holds. Entry filing stalls, filings miss their timing windows, and CBP may pull the shipment for inspection. Completing the document pack before dispatch is the cheapest risk reduction available, and it is the difference between a routine release and a week-long standstill.

Related reading

Plan your shipment

Start with your product details and delivery ZIP code. Request a freight quote.

Transit time is a core planning input. This guide compares West Coast and East Coast routing from China and explains what adds time before the cargo reaches the receiving door.

West Coast transit

West Coast routing gives China cargo the shortest ocean leg. Containers discharged at Los Angeles/Long Beach or Oakland typically run FCL in roughly 13–21 days port to port on standard sailings, with the fastest direct express services around 10–13 days from the major southern China ports. LCL adds the consolidation and deconsolidation steps on both ends, which pushes West Coast LCL out to about 20–30 days over the same ocean distance.

The appeal of the West Coast is the shorter water time, not necessarily the fastest door. Once the container is discharged it still has to clear customs, be picked up and move by truck or rail to the inland warehouse. For shipments bound for California, the Southwest or the Pacific Northwest that domestic leg is short. For the Midwest or the East Coast, a West Coast discharge means a long rail or truck ride inland, and the time advantage over an East Coast port narrows or disappears.

RoutingFCL port-to-portLCL port-to-portWhat to note
West Coast (LA/Long Beach, Oakland)13–21 days20–30 daysShortest ocean leg; fastest direct service about 10–13 days
East Coast (NY/NJ, Savannah)25–35 days32–45 daysVia Panama Canal; about 10–15 days more than the West Coast
Door-to-door (either coast)30–50 days typicalLCL adds 3–7 daysIncludes origin handling, clearance and final delivery

East Coast transit

East Coast routing reaches New York/New Jersey, Savannah and related ports through the Panama Canal, which is why the water leg runs longer. FCL on an East Coast routing commonly sits around 25–35 days port to port, and LCL roughly 32–45 days once both consolidation ends are included. On average the East Coast adds about 10–15 days of ocean time compared with the West Coast.

Some cargo reaches the East Coast by transhipment through a larger hub rather than a direct sailing, which can add a day or two but buys more frequency. The trade-off sits in the domestic leg: a container discharged in Savannah already sits in the Southeast, and NY/NJ already serves the Northeast and the rail corridors into the Midwest, so the final move to the receiver is often shorter and cheaper than hauling it cross-country from Los Angeles.

A top-down aerial view of a container ship docked at a port, loaded with colorful shipping containers and serviced by tall red gantry cranes.

What changes the total time

The ocean port-to-port number is only one slice. On the origin side, LCL cargo must be delivered to the forwarder’s consolidation warehouse and meet cut-off days before the vessel closes; missing that cut-off rolls the shipment to the next sailing. At the destination, deconsolidation, customs processing and any prior-notice coordination for food and supplement cargo all sit between discharge and release.

Peak season changes the math. Congestion at either end, vessel omissions and rotation shifts can stretch schedules, and consolidated LCL windows widen. The importer-side filings also matter: prior notice for ocean cargo is due at least 8 hours before arrival, and ISF must be filed 24 hours before the cargo is loaded on board the vessel; a late filing adds days. These are the importer of record’s filings, coordinated with the forwarder. Confirm the current schedule with your forwarder for the sailing week you are booking.

From port to receiving door

After release, drayage moves the container from the terminal to a deconsolidation warehouse or directly to the receiver. For LCL, the warehouse breaks the consolidation and stages cartons for delivery, and appointments then book the truck to the receiving dock. Each of those steps adds a day or more, and delivery to a remote ZIP or a liftgate-only site adds still more.

The delivery ZIP is the variable that turns a port-to-port estimate into a door-to-door plan. The same sailing into LA can reach a Sacramento warehouse in a few days of trucking but a Michigan warehouse after a week or more of rail. Build the delivery ZIP into the quote from the start, so the total journey time — not just the ocean leg — reflects where the goods actually have to land.

Frequently asked questions

Is the West Coast always faster?

Not for every destination. The ocean leg to LA/Long Beach or Oakland is usually shorter, but once the cargo clears and moves inland, a shipment bound for the East Coast or the Midwest can arrive no sooner — and sometimes later — than one routed to an East Coast port. Judge the door-to-door time for your specific delivery ZIP rather than the port-to-port number alone.

Where do I find current transit times?

Transit times move with sailing schedules, vessel rotations and peak-season congestion, so the exact number for your week is the one your forwarder confirms. Ask for the scheduled transit on the specific sailing you are booking, then build in a buffer on top, rather than relying on a generic table that may not reflect the current week.

Related reading

Plan your shipment

Start with your product details and delivery ZIP code. Request a freight quote.

The US port you choose shapes transit time, cost and delivery options. This guide compares West Coast and East Coast gateways for food and supplement cargo from China.

West Coast ports

Los Angeles/Long Beach, together in San Pedro Bay, form the largest container gateway complex in the United States and the main entry point for China and Asia trade. The two ports combined handle roughly two-fifths of US waterborne container volume — about 20.1 million TEU in 2025 — which means dense weekly services and plenty of sailing choices from China. For cargo feeding the West Coast, the Southwest or the Pacific Northwest, this is the natural first look.

Oakland is the other meaningful West Coast option. It is the only deep-water container port in Northern California and serves Northern California, the Central Valley and western Nevada, handling roughly 2.25 million TEU in 2025. If your receiver sits in the northern part of the state or the inland West, routing to Oakland can shorten the drayage compared with hauling up from LA/Long Beach.

A high-altitude aerial view of the Los Angeles and Long Beach port complex, showing massive container terminals, breakwaters, and the surrounding city.
Long Beach Port

East Coast ports

New York/New Jersey is the largest East Coast gateway, moving on the order of 7–9 million TEU a year and radiating by road and rail across the Northeast and into the Midwest. Savannah is the fastest-growing East Coast gateway, home to one of the largest single container terminal facilities in North America and handling roughly 5–6 million TEU a year; its reach is the Southeast.

Routing to either East Coast port runs through the Panama Canal, which adds ocean time versus the West Coast — East Coast FCL transit of about 25–35 days against 13–21 days to LA/Long Beach. The case for the East Coast is not speed on the water; it is a shorter, cheaper final move once the container lands where your customer actually is.

GatewayPositionRoughly how it handles volumeBest for
LA / Long BeachLargest US gateway complex (San Pedro Bay)~40% of US waterborne containers; ~20.1M TEU (2025)West Coast, Southwest, Pacific Northwest
OaklandOnly deep-water container port in Northern California~2.25M TEU (2025)Northern California, Central Valley, western Nevada
NY / NJLargest East Coast gateway~7–9M TEU/year; rail into the MidwestNortheast and Midwest distribution
SavannahFastest-growing East Coast gateway~5–6M TEU/year; large single terminalSoutheast distribution

Port choice and delivery ZIP

The port should match the receiving warehouse, not the other way around. A container that discharges in Los Angeles but feeds a New Jersey warehouse incurs a long and expensive domestic haul, while the same cargo routed into NY/NJ lands close to the door. Work backward from the delivery ZIP: where is the carton actually going to be received, and which gateway puts the shortest road or rail move on the other end?

Domestic transit from the gateway to the final ZIP is part of the planning, not an afterthought. Rail corridors give you a predictable mid-cost option for longer inland moves, while truck wins shorter distances and tighter scheduling. Confirm how your product and its delivery ZIP fit each gateway before you lock the routing.

How the port choice changes cost and time

Different gateways carry different ocean rates, destination charges and drayage. A lower ocean rate to the West Coast can be offset by a longer, costlier inland leg to an Eastern warehouse, just as a longer, pricier ocean leg to the East Coast can be offset by a short final delivery. Destination handling and deconsolidation also vary by terminal.

The right way to compare is like-for-like: ask each forwarder to quote the same product, volume, weight and delivery ZIP into each gateway, with ocean rate, destination charges and delivery itemised. That tells you the true landed cost for each port rather than a headline ocean number. Confirm the routing, transit and charges for your lane with your forwarder.

Semi truck hauling a shipping container on the highway for US inland delivery

Frequently asked questions

Which port is best for my cargo?

It depends on the delivery ZIP, your volume and your schedule. A West Coast gateway usually wins for Western receivers, while NY/NJ or Savannah shortens the final move for Eastern and Midwestern ones. Compare quotes on the same assumptions — same product, volume, weight and ZIP — for each gateway before you decide.

Can I choose the port after booking?

The port is part of the routing decision, so confirm it at quote stage rather than after the booking is made. Changing the gateway later can alter the ocean rate, the inland move and the delivery plan. Tell the forwarder your delivery ZIP up front so the port choice is built into the first quote.

Related reading

Plan your shipment

Start with your product details and delivery ZIP code. Request a freight quote.

THE IMPORT NOTEBOOK

Supplement labels. Review before dispatch.

A practical preparation list for your importer and regulatory adviser—not a substitute for a product-specific label review.

Collect the final label

FDA’s general dietary supplement labeling guide describes five core statements: product identity, net quantity, nutrition labeling, ingredients, and the name and place of business of the manufacturer, packer or distributor. Placement and presentation requirements also matter.

Provide a complete readable label file, including every panel. A cropped product photograph or a front-label mockup can omit information your adviser needs. Ask for review of the final version that will be applied to the shipped packs.

Connect the label to the actual cargo

  • Match product name and form with the invoice and packing list.
  • Supply the formula and manufacturer details alongside the artwork.
  • Itemise each SKU, flavour or pack size that has a different label.
  • Resolve translations and product claims with the qualified reviewer.

Label review is more useful before packing is complete. A change at that stage can affect product identification, carton marks and warehouse receiving records.

Avoid shortcuts in product descriptions

A vague “health supplement” description is not enough for a commercial shipment brief. State the actual product and physical form. Keep the claimed use and formula available for your importer’s assessment.

Do not present registration as approval of the label or product. Likewise, do not treat another company’s label as proof that your own formula and claims meet the applicable requirements.

Keep records for receiving

Use consistent SKU and batch references across the final label records, commercial documents and destination instructions. The receiving warehouse may also need carton identification and item details for its own inventory process.

The freight plan should use the finished cargo dimensions. If labels, packs or carton quantities change after quotation, share the update before booking.

Return to supplement shipping
YOUR NEXT CHINA → USA SHIPMENT

Your cargo.
A clear route to the USA.

From China origin to your US warehouse. Plan LCL or FCL ocean freight and FDA import preparation around your product, cargo volume and delivery destination.

THE IMPORT NOTEBOOK

Prior Notice. A shipment-specific task.

Organise the shipment details and confirm who will handle the notification before food is offered for import.

What Prior Notice addresses

FDA generally requires advance notification of imported food shipments unless an exemption applies. The notification concerns the shipment; it is not the same as registering a food facility or meeting an importer’s FSVP responsibilities.

For food arriving by water, FDA must receive and confirm Prior Notice at least 8 hours before arrival at the first US port. Agree an earlier working cut-off with the filing party; this arrival-based deadline is separate from CBP’s loading-based ISF deadline.

Plan the filing window

Prior Notice may be submitted through FDA’s PNSI no more than 15 calendar days before anticipated arrival, or through CBP’s ABI/ACS no more than 30 calendar days before arrival. The responsible filer should confirm the applicable submission system and keep the arrival details current.

FDA Prior Notice timing guidance

Organise information early

  • A precise product list and the relevant manufacturer information.
  • Quantities and pack format that agree with the commercial records.
  • Shipment and transport details as they become confirmed.
  • Importer, consignee and contact information requested by the responsible filer.

Use one reconciled set of shipment information. If the product quantity or transport arrangement changes, tell the filing party so it can determine whether a correction or further action is needed.

Coordinate the filing with freight

Identify the responsible filer and its cut-off before booking. Ask how the notification confirmation will be communicated to the importer and broker. Do not assume the forwarding team, factory and broker each think someone else is doing the same task.

A correctly organised filing does not promise entry release. An authority may still review the product or request additional information. The shipping plan should include a practical contact process if that happens.

Keep the tasks separate

Task Focus
Facility registration The facility and its registration obligations.
Prior Notice Notification of the particular food shipment.
FSVP Applicable importer supplier-verification responsibilities.
Customs and ISF Entry and ocean security filing requirements.

Use the shipment document checklist to collect your preparation records.

YOUR NEXT CHINA → USA SHIPMENT

Your cargo.
A clear route to the USA.

From China origin to your US warehouse. Plan LCL or FCL ocean freight and FDA import preparation around your product, cargo volume and delivery destination.

THE IMPORT NOTEBOOK

Shelf life starts before the sailing.

Build the packaging and replenishment plan around the product specification and the buyer’s receipt requirements.

Work backwards from the receiving date

Ask the destination for its minimum remaining shelf life at receipt. Compare that with the production or best-before information on the actual batch. Include production release, origin receiving, the proposed departure, sea transit, release and the receiving appointment.

A port arrival estimate is not a shelf-ready inventory date. Use a buffer for events such as schedule changes, inspections and delayed receiving. Agree a replenishment buffer with your receiving team.

Use the manufacturer’s storage specification

Get a clear temperature and humidity specification. “Ambient” can be too vague when a product is sensitive to heat or moisture. Ask what conditions the manufacturer considers acceptable during the intended transport period.

If ordinary dry-container conditions cannot meet the product’s needs, review a different service or equipment arrangement. Packaging improvements may protect against some handling risks, but they do not create a controlled-temperature transport chain.

Three layers of protection

Layer Review
Retail pack Closure, moisture barrier, bottle or pouch strength and seal integrity.
Outer carton Compression, product movement, fragile contents and carton marks.
Pallet or transport unit Stability, height, overhang, stackability and warehouse compatibility.

Measure after packing. Any added cushioning, pallet or outer protection changes the final cargo envelope and may affect cost.

Record a packing standard for repeated orders

Keep photographs of the agreed pack, carton and pallet. Record dimensions, gross weight, SKU marks and any special handling instruction. A repeatable packing standard helps the freight and receiving teams work from the same brief.

Review changes rather than assuming the last shipment’s plan still fits. A new pack, formula, supplier or delivery warehouse can affect the requirements.

See the full shipping process
YOUR NEXT CHINA → USA SHIPMENT

Your cargo.
A clear route to the USA.

From China origin to your US warehouse. Plan LCL or FCL ocean freight and FDA import preparation around your product, cargo volume and delivery destination.

THE IMPORT NOTEBOOK

ISF. Before the ocean loading.

Customs security filing and food shipment notification are different preparation tasks.

Confirm the applicable deadline

For standard ISF-10 ocean imports, eight importer data elements are generally due at least 24 hours before loading onto a US-bound vessel. Container-stuffing location and consolidator details are due as early as possible and no later than 24 hours before arrival at a US port. Confirm applicable exceptions and filing updates with your broker.

Do not use “24 hours before departure” as a casual substitute for the loading-based rule. Ask the filer which deadline applies to the actual shipment and when it needs the information from you.

Assign a responsible filing contact

Identify who is handling the ISF and how the necessary data will be supplied. Your importer and filing agent should resolve authorisation and identity questions. The forwarding team should coordinate the proposed loading arrangements with that process.

Keep the agreed contact informed when origin, supplier or cargo details change. The filing party decides whether the update requires further action; a packing change should not stay only in a warehouse chat.

Keep ISF and Prior Notice distinct

Preparation task Agency and purpose
Importer Security Filing CBP ocean cargo security filing.
Prior Notice FDA advance notification of imported food shipments where required.
Commercial entry The customs entry process and supporting records.
Product and facility preparation Applicable food, supplement and facility requirements.

One completed filing does not replace another. Use a preparation checklist that tracks the tasks and contacts separately.

Prepare before the cargo cut-off

Collect consistent commercial parties, product descriptions and shipment details early. Ask the broker for its working cut-off, which may precede the formal rule so it has time to resolve missing information.

If a task is incomplete, contact the responsible team before loading.

Open the shipment checklist
YOUR NEXT CHINA → USA SHIPMENT

Your cargo.
A clear route to the USA.

From China origin to your US warehouse. Plan LCL or FCL ocean freight and FDA import preparation around your product, cargo volume and delivery destination.

THE IMPORT NOTEBOOK

Who is your FSVP importer?

Different import and shipment roles can belong to different parties. Confirm the responsibilities before booking freight.

Start with the regulatory role

Under FDA’s FSVP rule, the importer is generally the US owner or consignee of the food at the time of entry. Where none exists, the rule provides for a US agent or representative of the foreign owner or consignee, whose consent must be confirmed in a signed statement. This FSVP role is separate from the foreign facility’s registration US agent.

FSVP obligations concern verification of foreign suppliers. Dietary supplements are not automatically exempt. For many finished supplements, modified FSVP requirements focus on dietary supplement current good manufacturing practices and exclude the standard hazard-analysis requirement. Different provisions can apply to ingredients or components. Confirm the applicable requirements with the FSVP importer.

Roles that should not be conflated

Role Question for your shipment
Importer of record Who is responsible for the customs entry arrangement?
FSVP importer Who holds the applicable food supplier-verification responsibility?
Food facility US agent Who represents the foreign facility for its registration-related role?
Customs broker Who is authorised to handle the customs filing?
Receiving warehouse Who accepts the physical cargo and on what terms?

A company may take more than one role by agreement, but a warehouse address or freight booking does not establish that agreement. Document the actual parties and contacts.

Questions for foreign brands

If you are sending stock you still own to a US fulfilment warehouse, ask your adviser who will take the applicable FSVP role. If a US buyer purchases the goods, confirm how the ownership and import responsibilities are structured. Do not assume the same arrangement works for both scenarios.

A logistics quote should make its coordination scope clear. It should not imply that freight forwarding automatically includes an FSVP representative or a completed supplier-verification programme.

Information for the shipment brief

  • Responsible business name and contact for the import arrangements.
  • Manufacturer identity and complete product list.
  • Broker contact and agreed document exchange process.
  • Written confirmation of any representative arrangement where applicable.

Share contact and business details needed for the booking. Keep confidential registration credentials out of an initial freight enquiry.

YOUR NEXT CHINA → USA SHIPMENT

Your cargo.
A clear route to the USA.

From China origin to your US warehouse. Plan LCL or FCL ocean freight and FDA import preparation around your product, cargo volume and delivery destination.

THE IMPORT NOTEBOOK

2026 food facility renewal.

The renewal window is October 1–December 31, 2026. Review the facility’s status alongside your shipment preparation.

The 2026 renewal window

FDA states that facilities required to register must renew during October 1 through December 31 of each even-numbered year. Its 2026 user guide lists the renewal period from October 1, 2026, 12:01 AM through December 31, 2026, 11:59 PM.

The guide distinguishes renewing a registration from updating its details. It also explains that a registration not renewed by the deadline is considered expired and removed from the account. Refer to FDA’s current instructions for the registration process and any required identifiers.

Make it part of the preparation calendar

Ask the responsible facility contact to review its status and renewal work before planning shipments that cross the year-end period. A freight booking can continue to develop while the facility resolves its records, but departure decisions should use confirmed information.

Keep a dated note of who handles the registration and which records are available to the importer.

What renewal does not replace

A facility record is separate from the product review, shipment notification and importer arrangements. Keep each task assigned to the relevant person rather than treating a single registration number as the entire import plan.

Confirm the practical handoff with your importer and adviser: which information is needed for this shipment, when it must be supplied and how changes will be communicated.

Use the official instructions

Use the FDA food facility registration renewal guide. Keep facility login credentials and registration PINs within the authorised team. Send only the information required for the agreed shipment task.

View the complete preparation checklist
YOUR NEXT CHINA → USA SHIPMENT

Your cargo.
A clear route to the USA.

From China origin to your US warehouse. Plan LCL or FCL ocean freight and FDA import preparation around your product, cargo volume and delivery destination.

THE SHIPPING JOURNAL

Seven details for a useful freight quote.

Give the freight team a clear product, cargo and receiving brief before comparing proposals.

By Haishun Tiancheng ·

All resources
Packaged foods and neutral supplement containers

1. Describe the finished product

State the product name and form: sealed tea, snack packs, capsules, gummies or a supplement powder. Include the SKU breakdown and full ingredients or formula for the responsible product review.

2. Prepare the label and manufacturer details

Keep a readable final label file, manufacturer identity and country of origin with the brief. Product classification and applicable import requirements should be resolved with your importer and adviser.

3. Measure after packing

Provide the final outer-carton or pallet dimensions, quantity and gross weight. Include overhang and non-stackable restrictions. An estimate is useful for an initial discussion; finished measurements are needed for a comparable proposal.

4. State the storage specification

Share the manufacturer’s temperature and humidity limits and remaining shelf life. Standard dry-container transport does not hold a specified temperature. Sensitive cargo needs an equipment and handling assessment before booking.

5. Identify the China handover point

Give the pickup city and whether cargo will be collected from a factory or delivered to an agreed origin warehouse. Add the expected readiness date and any loading restrictions.

6. Confirm the US receiving requirements

Provide the business delivery address, ZIP, appointment instructions, inbound reference and unloading facilities. Ask the receiver about pallet format and minimum remaining shelf life.

7. Identify the import contacts

Confirm the importer, broker and applicable FSVP role. Agree who handles shipment filings and the document cut-offs. A delivery warehouse address alone does not establish those responsibilities.

Use the shipment document checklist
YOUR NEXT CHINA → USA SHIPMENT

Your cargo.
A clear route to the USA.

From China origin to your US warehouse. Plan LCL or FCL ocean freight and FDA import preparation around your product, cargo volume and delivery destination.